D.G. Khan Cement Company Limited (DGKCC), a unit of Nishat group, is the largest cement-manufacturing unit in Pakistan with a production capacity of 5,500 tons clinker per day. It has a countrywide distribution network and its products are preferred on projects of national repute both locally and internationally due to the unparallel and consistent quality. It is list on all the Stock Exchanges of Pakistan.
 

DGKCC was established under the management control of State Cement Corporation of Pakistan Limited (SCCP) in 1978. DGKCC started its commercial production in April 1986 with 2000 tons per day (TPD) clinker based on dry process technology. Plant & Machinery was supplied by UBE Industries of Japan.

Acquisition of DGKCC by Nishat Group

Nishat Group acquired DGKCC in 1992 under the privatization initiative of the government. Starting from the privatization, the focus of the management has been on increasing capacity as well as utilization level of the plant. The company undertook the optimization by raising the capacity immediately after the privatization by 200tpd to 2200tpd in 1993.

Capacity Addition

To meet the increasing demand and to capitalize on its geographic location, the management further expanded the capacity by adding another production line with a capacity of 3,300 tons per day in year 1998. Design of the new plant is based on latest dry process technology, energy efficient and environmental protection from particulate pollution according to the international standards. The plant and machinery was supplied by M/s F.L. Smidth of Denmark. As a result, DGKCC emerged as the largest cement production plant in Pakistan with annual production capacity of 1,650,000 M tons of clinker (1,732,000 M.Tons Cement) constituting about 10% share of the total cement production capacity of the country. The optimization plan is still underway to increase the total capacity of the two units to 6700 TPD by mid of 2005 from 5500 TPD at present.


Expansion -Khairpur Project


Furthermore, the Group is also setting up a new cement production line of 6,700 TPD clinker near Kalar Kahar, Distt. Chakwal, the single largest production line in the country. First of its kind in cement industry of Pakistan, the new plant will have two strings of pre-heater towers, the advantage of twin strings lies in the operational flexibility whereby production may be adjusted according to market conditions. The project will be equipped with two vertical cement grinding mills. The cement grinding mills are first vertical Mills in Pakistan.  The new plant would not only increase the capacity but would also provide proximity to the untapped market of Northern Punjab and NWFP besides making it more convenient to export to Afghanistan from northern borders.
 