Cement Logo
  • An Image Slideshow
  • An Image Slideshow
You are here: Home » Cement » Pakistan Cement Industry » Attock Cement
Casting

report

report
The Attock Cement project was conceived and the company was incorporated in 1981, the plant finally commenced commercial production on June 1, 1988. The project is a Pak Saudi joint venture and involved initial capital outlay of around Rs 1.5 billion with foreign exchange component of around US $ 45 million. This made it one of the largest enterprises in the private sector. Pharaon Commercial Investment Company Limited holds 84.06% of total paid up share capital whereas the general public holds a total of 15.94% shares.

ACPL’s Cement plant was designed by Uzinexportimport (UEI) of Romania, all equipments, and ancillaries and steel structures was supplied by UEI and Limestone crusher and packing plant was manufactured by O & K and Havor and Boecker of Germany. Thus it is with a sense of pride that Attock Cement claims pioneer status in bringing the Pre-calcination / Pre-heating dry process technology to Pakistan.
 
© 2009 Cement Pakistan Co. |